Environmental Impact Assessment (EIA) of 131 km long, 132 kV connecting the powerhouse of Chameliya Hydroelectric Project at Balanch to the National Grid at Attariya.
1.
Scoping and preparation of Terms of Reference for EIA.
2.
Environmental baseline data collection.
3.
Impact assessment.
4.
Alternative analyses.
5.
Preparation of mitigation measures, monitoring and management plan, environmental auditing plans.
Feasibility study and EIA of 51 MW pondage-run-of-the-river scheme with 10 m high weir, surface desander, 5 km tunnel conveyance system, surge tank and surface powerhouse.
1.
Topographical survey, geological, geotechnical and hydrological investigations.
2.
Design of project components, plant capacity optimization.
3.
Design of 30 km long 132 kV transmission line.
4.
Environmental Impact Assessment of hydropower project
5.
Quantity and cost estimation.
6.
Economic and financial analysis.
132 kV Transmission Line for Likhu - IV Hydroelectric Project
Client :Nepal Electricity Authority
(Funded by World Bank)
Feasibility Study of run-of-the-river scheme with an installed capacity of 7.5 MW, diversion weir, surface desander, 3.5 km canal and tunnel conveyance system, forebay and powerhouse.
1.
Topographical survey, geological and geotechnical investigations.
2.
Hydrological studies.
3.
Feasibility level design of project components.
4.
Preliminary design of 35 km long, 66 kV transmission line.
5.
Initial environmental examination.
6.
PPA Negotiations with Nepal Electricity Authority.
66 kV Transmission Line for Indrawati – III Small Hydroelectric Project